2022 Assay Table and Hole Details

2022 Assay Table and Hole Details

Hole ID From
(m)
To
(m)
Length
(m)
Au
g/t
Ag
g/t
Hole
Purpose
Hole Azimuth
°
Hole Dip
°
Final Depth
(m)
Collar UTM East Collar UTM North
SG22-008 268 275 7 0.45 2.36 Geotechnical (Pit) 130 -60 349.15 549194 5693449
and 283 295 12 0.39 3.91
and 300 330 30 1.01 8.44
and 334 347.15 13.15 0.57 4.53
SG22-017 8 9 1 17.30 17.80 Geotechnical (Pit) 130 -60 551 549974 5693213
and 112 114 2 5.12 8.95
and 521 531 10 0.54 1.47
SG22-019 89 103 14 0.58 2 Geotechnical (Pit) 0 -75 281 549672 5693606
SG22-021 78 87 9 1.01 23.63 Geotechnical (Pit) 235 -75 551 549412 5693301
and 134 141 7 0.41 2.17
and 158 165 7 0.61 0.95
and 203 230 27 0.51 4.59
and 252 285 33 0.98 6.81
inc. 264 271 7 2.87 15.9
and 529 544 15 0.35 0.97
SG22-023 121.2 130 8.8 0.48 25.36 Geotechnical (Pit) 73.3 -75 497 549958 5693381
and 134 164 30 0.48 7.68
and 206 222 16 0.81 14.98
SG22-027 60 71 11 0.49 1.14 Geotechnical (Pit) 210 -70 501 549513 5693173
and 228 238.7 10.7 2.14 16.77
and 255 285 30 0.51 3.92
and 295.14 301 5.86 1.61 7.98
and 305 326.65 21.65 0.49 3.87
SG22-029 90 99 9 0.59 4.41 Geotechnical (Pit) 178.7 -75 299 549756 5693136
SG22-012 165 172 7 0.73 2.63 Geotechnical (Dyke)   0 -90 201.44 550041 5692408
SG22-020 65 71 6 0.53 8.71 Geotechnical (Dyke)   0 -90 101 549900 5692050
SP22-ARD-004 73 117 44 0.57 3.65 ARD - Portage Zone 0 -90 152 549890 5693075
SP22-ARD-005 47 55 8 0.61 7.04 ARD - Portage Zone 300 -55 152 550136 5693193
and 91 99.4 8.4 0.67 3.19
and 126 133.83 7.83 0.41 2.61
and 137 151 14 0.63 4.99
SP22-ARD-006 94 110 16 0.38 2.58 ARD - Portage Zone 0 -90 110 550122 5693288
SP22-ARD-007 27 32.55 5.55 1.66 5.33 ARD - Camp Zone 0 -90 64.2 548881 5694077
SP22-ARD-008 8 12 4 2.39 1.82 ARD - Camp Zone 0 -90 71 548922 5694242
and 19.45 21 1.55 3.66 2.9
SP22-ARD-010 85 104 19 1.17 15.28 ARD - Portage Zone 0 -90 167 549690 5693025
SP22-ARD-011 129 130 1 9.4 3 ARD - Portage Zone 60 -50 202 549095 5693584
SP22-ARD-012 212 228 16 1.75 13.95 ARD - Portage Zone 35 -45 251 549005 5693680
and 247 251 4 0.69 2.63
SP22-ARD-013 2 5 3 0.71 6.1 ARD - Portage Zone 55 -55 302 550023 5693574
and 152 153 1 1.09 1.3
 
Notes:
1. Assaying for the Springpole 2022 drill program was completed by Activation Labs (ActLabs) laboratories in Thunder Bay, Ontario.  Prepared 50 g samples were analyzed for gold by lead fusion fire assay with an atomic absorption spectrometry finish, and multi-element assay (including silver) was by inductively coupled plasma (ICP) analysis with an aqua regia digest.   
 
2. Reported widths are drilled core lengths
 
3. Easting and northing coordinates for samples are Universal Transverse Mercator (UTM), WGS84 datum, Zone 15N.

Join our email list to receive news and updates on First Mining.

Click here to subscribe

Subscribe

Stay up to date with our latest news